Some of the problems are, the EOR does not get the component design they need to match their building design, the final building is not the building the EOR designed, changes are made that are not approved by the EOR, changes are made that are not coordinated with other trades. These can result in the material supplied by the company doing the delegated design does not fit into the building causing construction delays.