Steel Joist Manufacturer New Millennium Building Systems
Steel Fabricator Steel Fab, Inc.
This is the Painting Facility for the Nissan Leaf Electric Vehicle. The project consisted of girder, short-span and long-span joists with wide flange beam headers being bolted to joist vertical members.
The use of a steel joists and joist girders over a heavier, less flexible structural system was economical as well as structurally effective.
Distribution Center
Industrial
This project had an aggressive schedule with only six weeks for engineering and start of delivery. The entire project delivered in three to four months and each sequence required multiple loads of material on-site at one time.
This project is a Distribution Center servicing northern California for Medline Industries, Inc. The project sits on 37 acres & consists of the main warehouse of 1,050,000 square feet & an office area of 24,000 square feet in the Prologis International Park of Commerce in Tracy, CA.
This project is the design, construction and installation of 135,000 sq ft. of industrial and vast, steel fabricated mezzanines, as part of a complex material handling system for Skechers USA, in Moreno Valley, CA.