Steel Joist Manufacturer New Millennium Building Systems
Steel Fabricator Steel Fab, Inc.
This is the Painting Facility for the Nissan Leaf Electric Vehicle. The project consisted of girder, short-span and long-span joists with wide flange beam headers being bolted to joist vertical members.
The use of a steel joists and joist girders over a heavier, less flexible structural system was economical as well as structurally effective.
Duke Perris Logistics Center II
Industrial
The Duke Perris Logistics Center is a LEED Certified building with a 36′ clearance under roof structure for racks & storage. Arched canopies & stone veneer at office areas were added to the project to create a more aesthetic appearance.
John Deere Des Moines Works Building 40, Deere Company’s new production building on the John Deere Des Moines Works Campus in Ankeny, IA is 301,458 square feet with a standard 40×60 ft column grid.
This project is the design, construction and installation of 135,000 sq ft. of industrial and vast, steel fabricated mezzanines, as part of a complex material handling system for Skechers USA, in Moreno Valley, CA.