FAQ – Uplift and Wind

Return to FAQ

When is uplift bridging needed?
Uplift bridging is required whenever the bottom chord goes into compression. This will be true if there are net concentrated up loads.

 

How should seismic and wind loads be specified?
By providing a complete load diagram to the manufacturer. See the SJI Code Of Standard Practice for additional information.